  1. Stage 01

    Site inspection

    We measure, check falls, edges and expansion joints, test the substrate for soundness and identify anything that must be repaired before coating. You get a written quote against a defined scope.

    • Measured areas and m²
    • Substrate soundness check
    • Colour and pattern sampling
    Red brick-pattern spray-on paving laid over a concrete driveway, photographed low to the surface
  2. Stage 02

    Surface preparation & pressure clean

    The stage that decides whether the job lasts. High-pressure cleaning, degreasing of oil-affected zones, treatment of moss and organic growth, and grinding back any failed coating or laitance.

    • High-pressure clean
    • Degrease and decontaminate
    • Grind back failed coatings
    Operator in full PPE running a twin-head concrete grinder to prepare a commercial floor before coating
  3. Stage 03

    Repairs & crack treatment

    Cracks are chased out and filled, edges and spalled sections rebuilt, and likely movement lines planned into the pattern so any future movement is disguised rather than fought.

    • Crack chasing and filling
    • Edge and spall repair
    • Expansion joints honoured
    Close view of black stencil concrete brick pattern with white joint lines on a road median
  4. Stage 04

    Spray application

    The slab is primed and the polymer-modified overlay is sprayed in passes to an even build. Falls and drainage are unchanged because the overlay follows the existing profile.

    • Primer coat
    • Multiple overlay passes
    • Even build across the area
    Terracotta herringbone spray-on paving with a curved border edge beside plain concrete
  5. Stage 05

    Stencil, pattern & colour

    Stencils are laid and colour applied while the overlay is workable, then lifted to reveal crisp joint lines. Base and joint tones were agreed at inspection against the house.

    • Pattern set out to scale
    • Base and joint tones applied
    • Cut lines and terminations
    Grey plain spray-on concrete driveway with a stencilled compass rose feature at its centre
  6. Stage 06

    Sealing & aftercare

    Two coats of UV-stable sealer, with a non-slip additive wherever the surface is used wet. You get cure times, cleaning guidance and a re-seal interval in writing.

    • Two-coat sealing
    • Non-slip where required
    • Written aftercare and cure times
    Bronze and blue metallic epoxy floor with pale marbled veining under a mirror gloss
Terracotta spray-on paving in a European fan cobble pattern wrapping around a stone-clad entry
Next step

Book a site inspection.

Free measured quotes across Perth metro and surrounds - driveways, pool surrounds, alfrescos, paths and courtyards.

Robert Baumgarten · Perth, WA · enquires.spraypaveperth@gmail.com